Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 8B. I-94: TH 280 to DT Street Paul.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $12 million per mile (includes ATM and non-ITS infrastructure). ATM component: $15 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
10A144E92F35128185257981005D7FDB
Unit
Per Mile
Cost Type
Reported Units
5.1 miles
Capital Cost Per Unit
12000000.00
OM Cost Per Unit
50000.00
Geo