Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 8A. I-94: DT Minneapolis to TH 280.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $13.5 million per mile (includes ATM and non-ITS infrastructure). ATM component: $9 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
0D341862FA383ED685257981005D7E72
Unit
Per Mile
Cost Type
Reported Units
3 miles
Capital Cost Per Unit
13500000.00
OM Cost Per Unit
50000.00