Travel-time Optimization on I-285 with Improved Variable Speed Limit Algorithms and Coordination with Ramp Metering Operations 02/01/2019
Alternative Designs to Alleviate Freeway Bottlenecks at Merging, Diverging, and Weaving Areas 05/01/2020
Implementation of a Variable Speed Limit/Ramp Metering Strategy to Increase Freeway Capacity at Metered On-Ramps 10/01/2020
Coordination of Freeway Ramp Meters and Arterial Traffic Signals Phase II-B - Field Implementation 02/01/2021
A Planning Tool for Active Traffic Management Combining Microsimulation and Dynamic Traffic Assignment 09/02/2018
Evaluating the combined effect of ramp metering and variable speed limits on the French A25 motorway 09/07/2017