Coordinate Long-Term Planning Schedules and Goals to Enhance Data Exchange and Collaborative Efforts Among Multiple Metropolitan Planning Organizations (MPOs).

Coordinate long-term planning schedules and goals to enhance collaborative efforts. Beginning with manageable projects and tracking their progress and results in a transparent fashion helps…
Content type
Date Posted
02/29/2024

Fair Value Commuting Pilot Program Deployed in Several Cities in Silicon Valley Led to a 40 Percent Reduction in Vehicle Miles Traveled and 46 Percent Reduction in Energy Consumption for Participants.

METHODOLOGY The "Commuter Wallet" app, developed during this study, allowed users to plan, compare, and pay for journeys using various transportation alternatives, integrating available commute…
Content type
Date Posted
08/30/2023

Study Applying Informed Mode Change as a Demand Management Strategy for Rio Olympic Games Estimated a 10.6 Percent Improvement in Collective Travel Time If 1.4 Percent of Car Trips Were Limited.

METHODOLOGY The study first estimated the travel demand of the local population and their fraction in private vehicles. The data resources used for this task were: mobile phone data, private…
Content type
Date Posted
07/25/2023

Have a Basic Level of Data, Data Exchange, and Situational Awareness Capabilities for Future Integrated Corridor Management Systems and Establish Effective Standards to Support Large-Scale Data Volumes and Data Exchange.

Some key lessons learned and recommendations for large scale traffic management across multiple ICMs are listed below: Have a basic level of data, data exchange, and situational awareness…
Content type
Date Posted
04/28/2023

Demonstrate the Value Proposition of Integrated Corridor Management by Monetizing its Benefits, Such as Improved Travel Time Reliability and Predictability.

Below are the lessons learned from this study:Clearly demonstrate the benefits of ICM by focusing on its impacts on travel time reliability and travel time predictability. Since costs pile up…
Content type
Date Posted
03/28/2023

Queue Warning Implemented as Part of an Integrated Active Traffic Management System Estimated to Reduce Travel Time up to 5.6 Percent and Reduce Crash Risk up to 28 Percent.

METHODOLOGY A dynamic traffic assignment (DTA) simulation platform was developed to perform microscopic simulations to test IATM control strategies. The effectiveness of each selected IATM strategy…
Content type
Date Posted
11/30/2022

Open-Source Scenario Planning Tools Can Provide Substantial Flexibility in Terms of the Types of Scenarios Considered At the Expense of Providing Precise Impacts.

The first task involved developing the base and scenario input files requiring 51 current and forecast year input files. The files spanned across areas of demographics, economy, transportation supply…
Content type
Date Posted
09/27/2022