Cost Subsystem
Equipment
Upgrade of fixed-site weigh station for ES (excluding items listed above)
UNID
FB3DFF336932AD44852571F70015C977
Sort Number
0
Unadjusted Low Capital Cost
44.00
Unadjusted High Capital Cost
80.00
Unadjusted Capital Cost Date
Adjusted Low Capital Cost
32.06
Adjusted High Capital Cost
58.29
Adjusted Capital Cost Date
Sort
173.12
Unadjusted Notes
Each. Some states reported building modifications, counters, cabinets, wiring, HVAC, structural changes to static scale building, highway poles and bases.
Adjusted Notes
Each. Some states reported building modifications, counters, cabinets, wiring, HVAC, structural changes to static scale building, highway poles and bases.
