Labor for Lane Control

Equipment
Labor for Lane Control
UNID
EFDF8C1E23DB74BC85256F1F00618ECC
IDAS Number
TM010
Sort Number
0
Unadjusted High O&M Cost
110.00
Unadjusted Low O&M Cost
90.00
Unadjusted O&M Cost Date
Adjusted Low O&M Cost
147.82
Adjusted High O&M Cost
180.67
Adjusted O&M Cost Date
Sort
114.00
Unadjusted Notes

Labor for two operators @ 50% of $100K.

Adjusted Notes

Labor for two operators.