The capital cost range includes cost of equipment and installation. Equipment includes fixtures, four lamps per lane for a three lane crosswalk, controller, pole, and push button activator. Installation is estimated at 150% to 200% of the total equipment cost. Capital cost would be greater if the system included automated activation of the in-pavement lighting system. O&M is approximately 10% of the equipment cost.
The capital cost range includes cost of equipment and installation. Equipment includes fixtures, four lamps per lane for a three lane crosswalk, controller, pole, and push button activator. Installation is estimated at 150% to 200% of the total equipment cost. Capital cost would be greater if the system included automated activation of the in-pavement lighting system. O&M is approximately 10% of the equipment cost.