Per state. For states also reporting hours, FTEs ranged from about 1 to 3 FTE. Depending on the functionality of the system being developed, the cost could be much higher, or much lower than the range shown.
Per state. For states also reporting hours, FTEs ranged from about 1 to 3 FTE. Depending on the functionality of the system being developed, the cost could be much higher, or much lower than the range shown.
