Contractor labor for new EC software development

Equipment
Contractor labor for new EC software development
UNID
D092D8C9CE8BF6EE852571F70015C94A
Sort Number
0
Unadjusted Low Capital Cost
150.00
Unadjusted High Capital Cost
902.00
Unadjusted Capital Cost Date
Adjusted Low Capital Cost
228.98
Adjusted High Capital Cost
1376.90
Adjusted Capital Cost Date
Sort
171.09
Unadjusted Notes

Per state. For states also reporting hours, FTEs ranged from about 1 to 3 FTE. Depending on the functionality of the system being developed, the cost could be much higher, or much lower than the range shown.

Adjusted Notes

Per state. For states also reporting hours, FTEs ranged from about 1 to 3 FTE. Depending on the functionality of the system being developed, the cost could be much higher, or much lower than the range shown.