Cost Subsystem
Equipment
Contractor labor for new SIE software development
UNID
C8AE150ABA6A0147852571F70015C965
Sort Number
0
Unadjusted Low Capital Cost
45.00
Unadjusted High Capital Cost
170.00
Unadjusted Capital Cost Date
Adjusted Low Capital Cost
66.22
Adjusted High Capital Cost
250.17
Adjusted Capital Cost Date
Sort
172.12
Unadjusted Notes
Per state. Depending on the functionality of the system being developed, the cost could be much higher or much lower than the range shown.
Adjusted Notes
Per state. Depending on the functionality of the system being developed, the cost could be much higher or much lower than the range shown.