Cost Subsystem
Unit Cost Element
Unit Cost Component
Description
System testing and documentation to prove functionality and operation for local, subsystem, and final system integration of an ITS network used to connect CMS and CCTV with a TOC. The project duration was 140 working days.
Capital Cost Per Unit
$21,000.00
Adjusted Capital Cost Per Unit
$22,409.10
Reported Units
1
Unit Cost Type
Unit
Lump Sum (LS)
CPI ID
3
CPI Name
PCU511210511210502
Year
2016
Notes
This bid tab data was proposed for a project designed to connect and integrate changeable message signs (CMS) and closed circuit television cameras (CCTV) with a Traffic Operations Center (TOC) to manage traveler information and traffic surveillance on the Route 91 Express Lanes between Orange, Anaheim, and Corona, California. (Bidder 1)