Sample Unit Cost Entries (3 unique unit cost entries found)
Unit Cost Entries for Roadside Rail Crossing (R-RC)
| Unit Cost Element | Unit Cost Component | Description | Location | Cost Type | Data Date | Reported Units | Units | Year (Dollars) | Capital Cost Per Unit | O& M Cost Per Unit | Lifetime (Years) | View Details |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Rail Crossing Controller | Rail Crossing Controller | Florida, USA | Actual | 2003 | Each (EA) | 2003 | $11,200.00 | $296.00 | 7 | View Details | ||
| Rail Crossing Pedestrian Warning Signal, Gates | Rail Crossing Pedestrian Warning Signal, Gates | LOW CAPITAL - 2 TRACKS. The constant warning signal costs from $14,317 to $21,043 for double tracks and $14,000 for each additional track. the detector and controller costs. | Florida, USA | Actual | 2003 | Location | 2003 | $14,317.00 | View Details | |||
| Rail Crossing Pedestrian Warning Signal, Gates | Rail Crossing Pedestrian Warning Signal, Gates | HIGH CAPITAL - 4 TRACKS. The constant warning signal costs from $14,317 to $21,043 for double tracks and $14,000 for each additional track. the detector and controller costs. | Florida, USA | Actual | 2003 | Location | 2003 | $44,000.00 | View Details |